During the Scenic Works phase, a high level of detail needed to be communicated to the wider Design Team, including all internal decorative treatments and the specific scenic ageing applied to each individual element.
To maintain continuity with both the external and internal studio sets, several non‑practical sockets and switches were required. The drawing above specifies their locations and mounting heights, ensuring they could be installed accurately and in line with the agreed specifications.
The matrix above is one of several documents produced in Microsoft Excel to coordinate and capture all relevant details required for the accurate replication of the Front Lot.
The matrix above is one of several documents produced in Microsoft Excel to coordinate and capture all details required for the accurate replication of the Front Lot. These particular sheets focus on the various hinge types and their positions across every building, enabling precise replication and ensuring continuity throughout the entire set.
This was the first iteration of the primary dummy sockets and switches matrix. Its purpose was to capture every accurate detail, from fixings and materials to precise locations, ensuring full continuity between the original external set and the replicated studio set.